Process
Six steps, in this order. The timeframes are typical for a product of moderate complexity; they shift when tooling has to be built or certificates obtained. We would rather quote an honest timeline than an optimistic one.
We establish what the product must do and how it will be judged: function, dimensions, material, quantity for the first order, target price, deadline and the market it is sold into. Whatever you have — a drawing, a photograph, a competitor's product, a sample — helps. None of it is a precondition.
We identify manufacturers, approach them directly and sort them out: who produces in-house, who only trades? Who has export experience into the EU? Who gives a usable answer at all? A large share drops out at this stage, before you see a single name.
Quotations are brought onto the same basis — same specification, same quantity, same trade term. Only then are prices comparable. You receive the overview with price breaks, MOQ, lead time and payment terms, plus our notes and a recommendation.
Samples are requested, checked and assessed. Deviations go back in writing and with photographs; the factory confirms the change before anything moves on. A second round if needed. The approved sample stays with us as the reference for mass production.
Specification, quantity, price, trade term, dates, packaging and inspection criteria are fixed in a document you can rely on later. Payment goes directly from you to the manufacturer; we do not hold client funds.
Inspection during production and before loading, to the agreed plan. You receive the report with photographs and a recommendation: accept, rework or stop. Then handover to your freight forwarder, or to a partner if you do not have one yet.
Plan for this
Not to lower expectations, but so you can plan around it. Almost every delay comes from one of these four corners.
Chinese New Year stops production for two to four weeks; before it everything is overbooked, after it staff are missing. Tết in Vietnam falls in the same window. An order placed in January does not ship in February.
A second or third round is normal, not an exception. Plan for it and you lose nothing; argue it away and you get it anyway — later and at higher cost.
Test reports for the European market take time and require a finished production sample. That cannot be run in parallel with production.
Space and rates swing sharply with the season. A finished order waiting two weeks for a slot is not unusual.